120
P
package contents 23 |
|
| |
Parallel ATA and Serial ATA |
| ||
devices | 61, 62 |
|
|
POST code checkpoints | 29 |
| |
39 | |||
Preinstallation instructions | 39 | ||
Preinstallation requirements | 23 | ||
Processor | 3 |
|
|
Product | 3 |
|
|
Product specifications | 6 |
|
R
Rear panel 17 |
|
removing CPU 45 |
|
removing the front panel | 42 |
removing the side panel | 41 |
S
SCSI HBA 57
SCSI HBA setup | 57 |
|
|
SCSI RAID HBA | 57 |
|
|
SCSI RAID HBA setup | 57 |
| |
Serial ATA ports | 4 |
|
|
Storage 4 |
|
|
|
system boards |
|
|
|
mainboard layout | 9 |
| |
system upgrade | 37 |
|
|
ESD precautions | 38 |
| |
39 | |||
preinstallation instructions | 39 |
T
turning off the system | 25 |
turning on the system | 24 |
U
Upgrading the CPU 45
Upgrading the system 37