4.8Installing GMT Fuse Designation Pins
4.9Installing Fuse Designation Card Holder and Card
Attach the fuse designation card holder to the fuse platform, to one of the fuse platform mounting brackets, or to a part of the rack. Remove the backing from the back of the card holder and press the card holder against the mounting surface. Fill out one of the cards with the required circuit information insert it in the card holder.
4.10 Installing Voltage Designation Label
Write the voltage used in the fuse platform on the voltage designation label and attach the label to the back of the fuse platform.
5 SYSTEM CHECK
Perform the following procedures to check out the platform after completing installation.
5.1Wiring Connections Torque Measurements
Measure the torque of all input, output, chassis ground and fuse alarm relay contact connections included in the
5.2Power On and Connection Polarity Test
Use the following procedure to apply power to the fuse platform and verify that the power input wires are connected correctly:
Note: This procedure assumes that no fuses have been installed yet.
1.Verify that the input power cables are connected to the correct terminals.
2.Verify that the circuit breakers for all circuits are on.
3.Apply power to the unit.
4.Verify that the
5.Verify that no fuse alarm LEDs on the front of the fuse platform are red or green.