bypass for the loads is done, i.e. activation of the manual bypass operation, suspension of the supply for the load by the UPS
The clearance of the voltage of each UPS is realised in the low voltage distribution. Now the expansion resp. the reduction of the parallel compound can be executed now. Watch out for the bridge between “JP1” and JP2” and the parallel operation line. The activation follows the steps in chapter 9.3.1.
i | For deactivating the UPS in the parallel |
compound just press the „OFF“ switch twice | |
behind each other. Like this the | |
can be removed from the parallel operation | |
|
54