Please shut down the entire system again if you i cannot solve a problem that occurs. To do this, press the OFF pushbutton for approx. 2 seconds. Disconnect the UPS from the mains by actuating the mains input miniature circuit breaker (no. 2,
p. 27/28). Please contact our hotline (see p. 5).
21.When the displays are correctly lit as described, switch on your loads one after the other. When doing this, take care not to exceed the maximum permitted load capacity of the UPS.
6.1Operating Modes
The following operating modes are distinguished:
Operation with mains supply (6.1.1)
Operation with faulty mains supply (6.1.2)
Operation with faulty inverter (6.1.3)
Manual bypass (6.1.4)
6.1.1Normal Operation
|
| Handumgehungspfad |
|
|
|
|
|
|
|
|
| Energiefluss bei | ||||||||||||
|
|
|
|
|
|
|
|
|
|
| vorhandenem Netz | |||||||||||||
|
| Netz |
|
|
|
|
|
|
|
| GR | EUE | WR |
|
| |||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Netzeingangs- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
| sicherungs- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
|
| automat |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||
|
|
|
|
|
|
|
|
|
|
| Lade GR |
|
|
|
| Hand- |
|
| Gesicherte | |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| umgehung |
|
| Schiene: |
| |||||
|
| Schematische |
|
|
|
|
|
|
|
|
|
| ||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||
|
| Darstellung |
| Batterie |
|
|
|
|
|
|
|
|
|
|
| |||||||||
|
|
|
|
|
|
|
|
|
|
| Verbraucher | |||||||||||||
|
|
|
|
|
|
| ||||||||||||||||||
| Energiefluss bei vorhandenem Netz |
|
|
|
| Power circuit with mains supply | ||||||||||||||||||
| Handumgehungspfad |
|
|
|
|
|
|
| Manual bypass path | |||||||||||||||
| Netz |
|
|
|
|
|
|
| Mains |
|
| |||||||||||||
| GR |
|
|
|
|
|
|
| REC |
|
| |||||||||||||
| EUE |
|
|
|
|
|
|
| SBS |
|
| |||||||||||||
| WR |
|
|
|
|
|
|
| INV |
|
| |||||||||||||
| Netzeingangssicherungsautomat |
|
|
|
| Mains input miniature circuit breaker | ||||||||||||||||||
| Schematische Darstellung |
|
|
|
|
|
|
| Schematic diagram | |||||||||||||||
| Lade GR |
|
|
|
|
|
|
| Load REC |
|
| |||||||||||||
| Batterie |
|
|
|
|
|
|
| Battery |
|
| |||||||||||||
| Handumgehung |
|
|
|
|
|
|
| Manual bypass |
|
| |||||||||||||
| Gesicherte Schiene |
|
|
|
|
|
|
| Secured busbar |
|
| |||||||||||||
| Verbraucher |
|
|
|
|
|
|
| Load |
|
|
39