Transient Operation and Slew Circuit Test
This test verifies transient and slew circuit operation. The slew circuits cannot be calibrated. If slew rise time and/or fall time are not within specifications or the slew circuits are inoperative, perform either the "Transient Generator Troubleshooting", or the "Slew Circuit Troubleshooting" in Chapter 3 of the mainframe Service Manual.
a.Use the test setup of Figure
60501B: 5V and 5A.
60502B: 10V and 10A.
b.Recall the factory default values by pressing .
c.Select the low current range by pressing
60501B: .
60502B: .
d. Set up transient operation by pressing | , then |
60501B:.
60502B:.
e.Set the slew rate to .05A/∝s (50A/ms) by pressing
(blue shift key), then
, then .
f.Adjust the oscilloscope for a single rise or fall time display. Use delayed sweep. The rise time when measures from
10% to 90% or the fall time when measured from 90% to 10% should be between: 60501B: 30 and 50∝s.
60502B: 75 and 125∝s.
Note that the Electronic Load's Tran annunciator is on.
60501B: 10∝s/DIV
60502B: 20∝s/DIV
SLEW 0.05
g.Set the slew rate to .0025A/∝s (2.5A/ms) by pressing (blue shift key), then , then .
12