MAINTENANCE
MACHETE BOOM 3/09 Maintenance Section 4-10
©2009 Alamo Group Inc.
MAINTENANCE

60” MACHETE HEAD MOTOR PLATE ATTACHEMENT

Before installing the rods run two nuts on each end
of the rods down 2". Place a ha rdened F lat washer
on each end. see FIGURE Mnt-B-0018.
Place the straights rods in the holes marked 1 thru
4. See FIGURE Mnt-B-0019.
Once the rods are in the holes through the Buck
Plate align the rods through the holes on the mount
plate and place the mount plate on top of the relief
block. The valve block bolts on top of the motor are
not equally spaced. Make sure the pockets align
accordingly. See FIGURE Mnt-B-0020.