Alcatel-Lucent 6300-24 Equipment Checklist, Package Contents, Optional Rack-Mounting Equipment

Models: 6300-24

1 58
Download 58 pages 48.23 Kb
Page 30
Image 30
RJ-45 Connector

3 Installing the Switch

RJ-45 Connector

Figure 3-1. RJ-45 Connections

Equipment Checklist

After unpacking the switch, check the contents to be sure you have received all the components. Then, before beginning the installation, be sure you have all other necessary installation equipment.

Package Contents

Gigabit Ethernet Switch

Four adhesive foot pads

Bracket Mounting Kit containing two brackets and eight screws for attaching the brackets to the switch

Power Cord—either US, Continental Europe or UK

RS-232 console cable

This Getting Started Guide

User Guide

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment available:

Four mounting screws for each device you plan to install in a rack—these are not included

A screwdriver (Phillips or flathead, depending on the type of screws used)

3-2

Page 30
Image 30
Alcatel-Lucent 6300-24 manual Equipment Checklist, Package Contents, Optional Rack-Mounting Equipment, RJ-45 Connector