Installation/Operation Supplement

Steam Requirements

Obtain specific steam service pipe sizes from the steam system supplier or a qualified steam fitter.

Refer to Figure 3 for proper steam pipe configurations.

When tumbler is on the end of a line of equipment, extend header at least 1.2 meters (4 feet) beyond tumbler. Install shut-off valve, union, check valve and bypass trap at end of line. If the system has a gravity return to boiler, omit trap.

Insulate steam supply and return lines for safety of operator and safety while servicing tumbler.

Keep tumbler in good working condition. Repair or replace any worn or defective parts.

WARNING

All system components must have a

8.6bar (125 psig) working pressure. Shut-off valves must be installed upstream of the steam solenoid valve and downstream of each steam trap so components can be isolated for maintenance or emergency purposes.

All components (solenoid valve, traps) must be supported to minimize loads on the tumbler steam coil connections.

W701

Thermal Oil Prep

It is the responsibility of the customer to install appropriate coil and heating system for thermal oil prep models. Alliance Laundry Systems, LLC. is not responsible for the performance or safety of the customer installed thermal oil system. To ensure proper operation, refer to the Specifications and Dimensions section for the BTU input of equivalent steam models. Thermal oil systems that do not deliver appropriate BTUs will dry slower. For solenoid valve wiring connections, refer to the Wiring Diagram supplied with tumbler.

20

© Published by permission of the copyright owner – DO NOT COPY or TRANSMIT

70278501 (EN)