Label 1
Label 2
20
4
Installation and Connection Instructions

Surface

CAUTION
Ensure that the machine is installed on a level oor of
sufcient strength and that the recommended clearances
for inspection and maintenance are provided. Never allow
the inspection and maintenance space to be blocked.
To prevent damage during transportation, the machine has been
equipped with four red transport brackets to eliminate every possible
movement of the tub.
After the machine has been placed level, take off the service panel and
back panel to remove these transport brackets. (See Label 2)
Important

Removal of the transport safety

The machine must never be activated before removing
these transport brackets. If the machine needs to be
moved from the installed location, rst reinstall the four
red transport brackets.
The machine must be placed on a at, solid surface (metal base, concrete
or solid ground). When using a metal base or with machines with steam
heating, the machine must be anchored on the 4 provided locations (A)
(See Label 1) in the base. (See Mounting Bolt Hole Locations). The height
of the pad should not exceed 203 mm - 8 inch.
The machine must be placed entirely level. For easy maintenance it is
recommended to keep a minimal distance of 600 mm - 23.62 inch between
the wall and the back of the machine.
If several machines are placed next to each another, there should be a
minimal distance of 30 mm - 1.18 inch between each machine.