Chapter 6: Powering On and Verifying the Stack
100
11. Repeat this procedure to power on the second power supply.
Warning
This unit might have more than one power source. To reduce the
risk of electric shock, disconnect all power cords before servicing the
unit. E30
12. Repeat this procedure to power on the other switches in the stack.
At this point, the stack is operational and ready to forward network traffic.
Before connecting the network cables, go to the next procedure, “Verifying
the Installation” on page 101.