Manuals
/
Brands
/
Computer Equipment
/
Switch
/
Allied Telesis
/
Computer Equipment
/
Switch
Allied Telesis
Beginning the Installation
Models:
AT-8100S/16F8-LC
AT-8100S/16F8-SC
AT-8100S/24
AT-8100S/24C
AT-8100S/24F-LC
AT-8100S/24POE
1
61
138
138
Download
138 pages, 1.1 Mb
61
Chapter 3
Beginning the Installation
The chapter contains the following sections:
“Installation Overview” on page 62
“Reviewing Safety Precautions” on page 63
“Planning the Installation” on page 67
“Unpacking the Switch” on page 69
Contents
Main
8100S Series
Stack Installation Guide
Page
Electrical Safety and Emissions Standards
Page
Contents
Page
Page
Page
Figures
Page
Tabl e s
Page
Preface
Document Conventions
Contacting Allied Telesis
Page
Chapter 1
Overview
Features
8100S Models
10/100 Mbps Twisted Pair Ports
Fiber Optic Ports
Power over Ethernet
10/100/1000 Mbps Twisted Pair Ports
SFP Slots
Stacking Ports
LEDs
MAC Address Table
Methods
Installation Option
Software and Interfaces
8100S Twisted Pair Series Switches
Page
8100S Fiber Optic Series Switches
Hardware Features
Front Panels
Figure 4 on page 25.
Figure 3. Front Panels of the 8100S Fiber Optic Series
Fiber Optic Ports
Back Panel Components
Management Panel
Model Naming Conventions
Page
10/100Base-TX Twisted Pair Ports
Speed
Duplex Mode
Maximum Distance
Power Over Ethernet
Cable Requirements
Port Pinouts
10/100/1000Base-T Twisted Pair Ports
Speed
Duplex Mode
Page
SFP Slots
Power Over Ethernet
PoE Standards
Powered Device Classes
Power Budget
Port Prioritization
Implementation
S1 and S2 Stacking Ports
eco-friendly Button
LEDs
10/100Base-TX Twisted Pair Port LEDs
10/100/1000Base-T Twisted Pair Port LEDs
100Base-FX Port LEDs
SFP Slot LED
S1 and S2 Stack Ports LEDs
Stack ID LED
Console Port
Power Supplies
Power Connectors
Page
Chapter 2
Stacking Overview
Stacking Guidelines
Page
Master Switch
Stacking Port Topologies
Page
Active Boot Configuration File
Page
Initialization Process
Page
Chapter 3
Beginning the Installation
Installation Overview
Reviewing Safety Precautions
Page
Page
Page
Planning the Installation
Choosing the Switches of the
Choosing a Site
Unpacking the Switch
8100S Series Switches
AT-8100S/24C
Page
Installing the Switches in an Equipment Rack
Page
Page
Page
Page
Labeling the Switches
Page
Page
Powering on a Switch
Page
Verifying and Setting the Stack ID Numbers
Starting a Local
Session
Starting a Telnet
Session
Page
Changing the Stack ID Number
old_id
new_id
Page
Cabling the Stacking Ports
Page
Page
Page
Chapter 6
Powering On and Verifying the Stack
Powering on AC Switches
Monitoring the Initialization Processes
Figure 38. Switch Initialization Messages
Figure 39. Switch Initialization Messages (Continued)
Page
Powering On DC Switches
Figure 41.
Figure 42.
Figure 43.
Page
Verifying the Installation
Page
Chapter 7
Cabling the Network Ports
Cabling the Twisted Pair and Fiber Optic Ports
Twisted Pair Ports
Fiber Optic Ports
General Guidelines
Installing Optional SFP Transceivers
Page
Page
Page
Managing the Stack
Local
Telnet
Secure Shell
Web Browser
SNMP
.
Specifying Ports in the Command Line Interface for Switches in a
.n
Page
Page
Chapter 8
Troubleshooting
Page
Page
Page
Chapter 9
Adding or Removing Switches
Removing or Replacing the Master Switch
Uploading the Active
File
filename
Removing the Current Master
Page
Page
Configuring the New Master
filename
Connecting the New Master Switch to the
Adding a New Member Switch
Page
Removing a Member Switch
Appendix A
Technical Specifications
Weights
Physical Specifications
Dimensions (H x W x D)
Ventilation
Environmental Specifications
Input Voltages
Power Specifications
Maximum Power Consumptions
Certifications
Quality and Reliability
RJ-45 Twisted Pair Port Pinouts
Fiber Optic Port Specifications
Page
RJ-45 Style Serial Console Port Pinouts
Stacking Port Pinouts