AT-GS900/16, AT-GS900/24 Gigabit eco-friendly Ethernet Switch Installation Guide

10.Power ON the end-nodes connected to the switch.

11.Check that all the L/A LEDs are green or blinking green for the ports connected to end-nodes. If any of the LEDs are OFF, refer to “Troubleshooting” on page 41 for instructions.

The switch is now ready for use.

39

Page 39
Image 39
Allied Telesis AT-GS900/16 manual