Installation
PARTS, TOOLS, MATERIALS
YOU WILL NEED THE FOLLOWING TOOLS AND MATERIALS FOR THE INSTALLATION:
Ca=ton or other heavy material for covering the counter top, |
|
Clear tape | Stud finder or thin nail, |
(for taping the templates to the wall) |
|
Keyhole saw (for the power cord hole)
Electric drill
I | Phillips screwdriver (for the screws) | 3/8" and 3/4" wood drill bits | |
|
| ||
|
| 1/2" and 3/16" | ..x_.====. |
| Pencil | drill bits |
|
Flat blade screwdriver (for the toggle bolts) | Plumb line |
|
Measuring tape (metal preferred) | Duct Tape |
Small side cutters or tin snips | Caulking gun |
•If you have brick or masonry walls, you wilt need special hardware and tools.
•The ductwork you need for the installation is not included. All wall and roof caps must have a
- 35 -