American Dryer Corp AD-24 Phase 7 installation manual 2 3-Phase 3ø Wiring Connections/Hookup

Models: AD-24 Phase 7

1 50
Download 50 pages 40.48 Kb
Page 24
Image 24
2)3-Phase (3ø) Wiring Connections/Hookup

2)3-Phase (3ø) Wiring Connections/Hookup

The electrical connections on ALL 3-phase (3ø) gas dryers are made into the rear service box located at the upper left area of the dryer. The electrical connections are made at the power distribution block located in the service box. The ground connection is made to the copper lug, also provided in this box. To gain access, the service box cover must be removed.

The neutral will only be used on 4-wire service. This is typical for 380-416V, 50 Hz.

b.Electrically Heated Models Only

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and sometimes neutral) and ground. Single-phase (1ø) power for the control circuit and for any single-phase (1ø) motors (if present) is done internally to the dryer by the factory at the oven contactor. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer.

CAUTION: The dryer must be grounded. A ground lug has been provided for this purpose.

Input connection wiring must be sized properly to handle the dryer’s current draw. This information is printed on the dryer’s data label.

The electrical input connections are made at the electric oven contactor located inside the assembly at the rear center upper section of the dryer. The ground connection is made to a copper lug also provided in this area. To gain access, remove oven rear service cover.

IMPORTANT: A strain relief must be used where the input wiring enters the oven assembly.

20

American Dryer Corp.

113222 - 5

Page 24
Image 24
American Dryer Corp AD-24 Phase 7 installation manual 2 3-Phase 3ø Wiring Connections/Hookup