American Dryer Corp AD-24 Phase 7 Procedure For Functional Check Of Replacement Components

Models: AD-24 Phase 7

1 50
Download 50 pages 40.48 Kb
Page 40
Image 40
PROCEDURE FOR FUNCTIONAL CHECK

SECTION VIII

PROCEDURE FOR FUNCTIONAL CHECK

OF REPLACEMENT COMPONENTS

1.Microprocessor Controller (Computer) Board a. Phase 7 Coin Models

1)Upon completing installation of the replacement microprocessor controller (computer) board, reestablish power to the dryer.

2)Start the drying cycle by pressing any temperature selection keys (HI, PP, or LO).

3)Verify that the applicable indicator lights on the microprocessor controller (computer) board are lit. (Refer to the illustration below.)

36

American Dryer Corp.

113222 - 5

Page 40
Image 40
American Dryer Corp AD-24 Phase 7 installation manual Procedure For Functional Check Of Replacement Components, Section