a. Reassembly Instructions For Non-Tilt Gas Dryers:

Lift the basket (tumbler) section onto the base.

1)The dryer has four (4) support posts assemblies which are located in each corner of the base. On top of each post assembly is a clevis block which must be bolted to the basket (tumbler) section. Use the 4-1/2” diameter x 1-1/8” long bolts and lock washers to bolt each clevis block to the basket (tumbler) section. (Refer to View 1 on the previous page.)

2)Basket (tumbler) power cable reconnection:

a)A plug and cable is located in the right of the base. This must be lifted up and reconnected into the mating socket located at the bottom of the right basket (tumbler) section.

b)Pull the basket (tumbler) section power cable up from the left side of the base through the hole in the bottom of the basket (tumbler) section. Reconnect the wires of this cable into the 2-inch x 4-inch (5.08 cm x 10.16 cm) basket (tumbler) junction box located at the bottom of the basket (tumbler) section. (Refer to the illustration on the previous page.)

c)Drop the control cable connector from the rear right side of the basket (tumbler) section into the base. Reconnect the industrial grade plug in to its mating socket.

3)Bolt the 24-inch (60.96 cm) diameter exhaust duct transition piece to the dryers rectangular exhaust duct. The exhaust duct exits the dryer from the rear of the base. (Refer to the illustration on the previous page.) Use the 1/4-20 self drilling screws supplied with the dryer.

11

Page 15
Image 15
American Dryer Corp AD-310 Phase 7 installation manual Lift the basket tumbler section onto the base