American Dryer Corp AD-310 Phase 7 service manual

Models: AD-310 Phase 7

1 116
Download 116 pages 19.79 Kb
Page 63
Image 63

5)Remove the valve support.

6)Remove the two (2) #6-32 x 1” hex head machine bolts by removing the two (2) #6 hex nuts and the two (2) #6 star washers.

7)To install new air jet assembly, reverse above procedure (Step #5 thru Step #1). b. Pneumatic Valve Muffler Replacement

1)Disconnect compressed air supply from the dryer.

2)Remove damaged or nonfunctional muffler (silencer) from valve body.

3)Replace muffler (silencer) by threading into valve body (snug fit).

5 9

Page 63
Image 63
American Dryer Corp AD-310 Phase 7 service manual