e. Troubleshooting Flow Chart - Quick Reference...

 

 

 

 

 

 

 

Second Visual Check

 

 

 

 

 

 

 

(Does Main Burner Ignite?)

 

Does

 

 

 

Is manual

 

 

 

 

knob on the Gas Valve

main burner

 

 

 

 

No

 

 

 

in the “ON”

 

light?

 

 

 

 

 

 

 

position?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

Turn knob to “ON/OPEN” position.

No Energize system and check for proper operation.

Go To

Third Visual

Check

Restore gas supply. Energize system and check for proper operation.

No

Is

gas available

at the source?

Is

dryer Internal Gas Shut-Off Valve and

ALL External Gas Shut-Off

Valves in the open

position?

Yes

Turn manual knob on the Gas Valve to the “OFF” position.

Connect a manometer to the Gas Valve outlet pressure tap.

 

 

Turn

 

 

 

 

manual knob on

 

 

 

 

the Gas Valve to the

 

 

 

 

“ON” position.

 

Yes

No

 

 

 

 

 

 

Energize the system.

 

 

 

 

 

 

 

Is outlet pressure

 

 

 

 

detected?

 

 

No

Correct supply pressure. Energize system and check for proper operation .

No

Is outlet

Water Column (W.C.) pressure correct?

Natural 3.5” - 4.0” W.C.

(8.7 mb - 9.9 mb) L.P. 10.5” - 11.0” W.C. (26.1 mb - 27.4 mb)

Yes

Energize

system. Is 24 VAC present across leads at the Gas

Valve?

 

 

 

With

 

 

system energized,

 

 

is 24 VAC present

 

 

No

 

 

 

across the “MV” and “GND”

 

 

 

terminals of the DSI

 

 

 

Module?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

Check Spark Electrode for proper gap and insure that the spark is in the path of the gas flow...

Refer To Service Section.

Yes

Replace the Gas Valve. Energize the system and check for proper operation.

Replace High

Voltage (HV)

leads

Energize system and check for proper operation.

Replace

DSI Module

Make the necessary corrections. Energize system and check for proper operation.

2 8

Page 32
Image 32
American Dryer Corp AD-310 Phase 7 service manual Second Visual Check