American Dryer Corp AD-310 Phase 7 service manual Tumbler/Drum SECTION. Serious Injury can Result

Models: AD-310 Phase 7

1 116
Download 116 pages 19.79 Kb
Page 89
Image 89

5) With finger tip, gently push and turn the bulb to unlock.

NOTE: A piece of tubing with an inside diameter the size of bulb may assist in bulb removal and replacement.

6) To install new bulb, reverse Step #5 thru Step #1. h. End of Cycle Light Replacement

1)Discontinue electrical power to the dryer.

2)Loosen and remove the cap screw on the top of the cap.

3) Remove the cap.

4) Loosen and remove the screw going into the lens.

5)Twist out lens and remove bulb/light.

6)To install new bulb, reverse Step #5 thru Step #1.

i. Tilt Switch Replacement

1)Discontinue electrical power to the dryer.

2)Remove the base panel from the left hand side of the dryer.

CAUTION: DO NOT PLACE HANDS BETWEEN THE DRYER BASE and THE BASKET

(Tumbler/Drum) SECTION. SERIOUS INJURY CAN RESULT.

3)Unscrew tilt switch.

4)Loosen and remove the two (2) screws securing the junction cover.

5) Remove the junction cover.

6) Loosen and remove the two (2) mounting screws.

7) Loosen and remove cord grip cap.

8) Remove cord grip.

9) Place pivot arm in the 1 o’clock position for the front tilt switch and in the 11 o’clock position for the rear tilt switch.

Verify that the body orientation and the head orientation are correct.

8 5

Page 89
Image 89
American Dryer Corp AD-310 Phase 7 service manual Tumbler/Drum SECTION. Serious Injury can Result