American Dryer Corp ML-130 II installation manual

Models: ML-130 II

1 59
Download 59 pages 63.29 Kb
Page 39
Image 39

6.Steam Damper Air Piston (Flow Control) Operation Adjustment System

Although the damper operation was tested and adjusted prior to shipping at 80 PSI (5.51 bars), steam damper operation must be checked before the dryer is put into operation. Refer to page 34 for instructions to check steam damper system operation. If damper air adjustment is necessary, locate flow control valve and make necessary adjustments as noted below.

35

Page 39
Image 39
American Dryer Corp ML-130 II installation manual