American Dryer Corp ML-310 Phase 7 service manual

Models: ML-310 Phase 7

1 116
Download 116 pages 27.96 Kb
Page 90
Image 90

Verify that the tilt switch arm is not in the vertical position or damage will result.

10)Holding the tilt arm, tighten up (snug up) on the nut.

11)Hold pivot point with a screwdriver and tighten the nut.

12)Replace base panel.

13)Reestablish electrical power to the dryer. j. Tilt Switch Adjustment

1)Discontinue electrical power to the dryer.

2)Remove the base panel from the left hand side of the dryer.

CAUTION: DO NOT PLACE HANDS BETWEEN THE DRYER BASE and THE BASKET (Tumbler/Drum) SECTION. SERIOUS INJURY CAN RESULT.

3)To adjust the pivot arm; hold the arm with a #10 metric wrench and loosen the nut.

4)Place pivot arm in the 1 o’clock position for the front tilt switch and in the 11 o’clock position for the rear tilt switch.

Verify that the tilt switch arm is not in the vertical position or damage will result.

5)Holding the tilt arm, tighten up (snug up) on the nut.

6)Hold pivot point with a screwdriver and tighten the nut.

7)Replace base panel.

8)Reestablish electrical power to the dryer.

8 6

Page 90
Image 90
American Dryer Corp ML-310 Phase 7 service manual