i. Troubleshooting Flowchart - Quick Reference...

Second Visual Check

Spark Present But Main Burner Does Not Come On

Is main valve wiring securely attached to terminal M.V.(3) and ground?

No

Yes

Secure wiring to

M.V.(3) and ground.

Replace

DSI module

Determine why continuity does not exist.

Is 24 VAC present

between terminals M.V.(3)

and ground?

No

Yes

Check for continuity in

wiring from M.V.(3) to gas valve, and gas valve to GR.

No

Yes

Set gas pressure

Natural 3.5 inches W.C. (8.7 mb) L.P. 10.5 inches W.C. (26.1 mb)

Is inlet gas pressure per

manufacturer's specifications?

No

Yes

Correctly adjust the gap and position of spark ignitor.

Is spark gap .125 in.(3.175 mm)

and in gas stream?

No

Yes

Replace gas valve.

2 1

Page 25
Image 25
American Dryer Corp ML-310 Phase 7 service manual Second Visual Check