AP120BC1000-3/ AP120BCF1300-3 Manual
31
3. HARD CHILL CYCLE
To perform a hard chill cycle, follow steps 1 or 2 (above), EXCEPT in step 1.b (above) press
instead of .
4. SHOCK FREEZE CYCLE
To perform a shock freeze cycle, follow steps 1 or 2 (above), EXCEPT in step 1.b (above) press
instead of .
5. OPTIONAL UV (STERILIZATION) CYCLE
a. To perform a UV cycle remove all food, then press
the (“UV LIGHT”) button.
b. Press the ("START/STOP") button to start the
UV cycle.
READY TO
START
Blinks
The display will show briefly:
Then the display will now show:
29:59
Will count
down to
00:00
OPERATING MODE
CHOOSE
OPERATING CYCLE
03.07.2006 11:43 AM
UV CYCLE
READY TO START
STARTING CYCLE . . .
After 30 minutes the display will show:
The controller will beep for a few seconds.
COMPLETE
Blinks
03.07.2006 11:43 AM
UV CYCLE
UV TIME 29:59
The operator can now end this cycle by pressing ("START/ STOP").
Then the display will show:
03.07.2006 12:13 PM
UV CYCLE
COMPLETE
OPERATING MODE
CHOOSE
OPERATING CYCLE