AP120BC1000-3/ AP120BCF1300-3 Manual
1
INDEX
INTRODUCTION 3
CONTROLLER FEATURES 3
OPERATING MODES 3
AUTOMATIC MODE 3
MANUAL MODE 4
OPERATING CYCLES 4
PRINTER (OPTIONAL) 4
PC CONNECTION (OPTIONAL) 4
INSTALLATION OF REMOTE UNITS 5
REQUIREMENTS TO BE MET DURING INSTALLATION (8 STEPS) 5
INSTALLATION AT THE SAME LEVEL 5
INSTALLATION AT DIFFERENT LEVELS 6
CONNECTION PIPING FOR REMOTE CONDENSING UNITS 6
INSTALLATION 7
WARNINGS 7
PREPARATION 7
INSTALLATION 7
LOCATION 7
DIMENSIONS 7
ELECTRICAL AND REFRIGERATION SPECIFICATIONS 8
CONNECTION TO THE REMOTE UNIT 8
CONDENSATE DRAINAGE CONNECTION 8
VERIFYING CORRECT INSTALLATION 8
SPACES AROUND THE CABINET 9
STARTING & TESTING THE UNIT 10
USING THE HURRICHILLâ„¢ TECHNOLOGY 11
BLAST CHILLING 11
SHOCK FREEZING 11
SOFT CHILL CYCLE 11
HARD CHILL CYCLE 11
SHOCK FREEZE CYCLE 11
PANNING AND LOADING 12
PANNING 12
LOADING 12
CONTROL PANEL FOR MODELS AP120BC1000-3 / AP120BCF1300-3
BLAST CHILLERS / SHOCK FREEZERS 13
KEYBOARD KEYS 14
KEY COMBINATIONS 14