American Power Conversion 240-320kW 480V manual Start UPS from complete power down, UPS Start-up

Models: 240-320kW 480V

1 31
Download 31 pages 33.81 Kb
Page 7
Image 7

Stop/Start UPS and Operating the External Service Bypass

The UPS is now isolated. Maintenance/repair, disconnection or removal can now be carried out.

CAUTION!

Recharge batteries out of service every 3 months to prevent damage.

WARNING!

Internal DC capacitor may contain energy even after the UPS has been switched off. Allow for automatic discharge by waiting at least 5 minutes after switching off UPS and battery breakers before working on the UPS.

2.4Start UPS (from complete power down)

2.4.1 UPS Start-up

CAUTION!

Make sure all cable connections are in place prior to first start-up.

NOTICE!

Green / ON

Red / OFF

After first system start-up, check that battery temperature is displayable (press and simultaneously on the display – it reads NV (not valid) if incorrectly installed). A battery capacity test is recommended after the electric installation.

NOTICE!

If for any reason the start-up procedure is interrupted, wait for the display to show the step 4 message: “Stop charge DC capacitors : YES” and repeat procedure from there.

CAUTION!

Do not close the MCCBs in the Battery Breaker Box unless the display reads: “Close MCCB” - otherwise the UPS may be damaged. If the display reads “DC capacitor charge error”, do not close MCCB.

Call for assistance.

 

990-4039

 

 