Stop/Start UPS and Operating the External Service Bypass

CAUTION!

Do not leave UPS out of service for more than 48 hours. Refer to section 2.3 Stop (for complete power down).

2.5.2Switching the Single System UPS from External Bypass into Normal UPS Operation

Single Utility

Utility

Load

Utility 2

Service Bypass

Switch

APC Silcon

Dual Utility

Load

Service Bypass

Switch

APC Silcon

UPS

Utility 1

UPS

 

990-4039

 

 

10

User Guide APC Silcon 240-320kW 480V UPS

Page 10
Image 10
American Power Conversion 240-320kW 480V manual Service Bypass Switch APC Silcon