Initial Inspection

Inspection

Inspect the UPS upon receipt. Notify the carrier and dealer if there is damage. The packaging is recyclable; save it for reuse or dispose of it properly.

Unpacking

Move the UPS, in its shipping package, as close to the desired location as possible. Then follow these instructions:

Use scissors or a knife to cut the plastic straps and open the package.

Unpack all visible foam pieces and the wooden unloading ramp.

Remove the carton liner.

Pull out the two (2) metal bars and set aside.

Insert the metal pallet brackets into the holes on the unloading ramp.

Have two (2) people, standing on either side of the Smart-UPS DP, wheel the unit down the unloading ramp. Do not stand in front of the UPS.

Refer to this User’s Manual for safety information and installation instructions.

Lift off the cardboard box that covers the top and sides of the package. A wooden pallet forms the bottom of the box.

Unscrew the hold-down bolts that secure the Smart-UPS DP to the pallet.

Open the literature kit and locate the two (2) metal pallet brackets.

Attach the unloading ramp to the pallet.

990-1007A, Revision 2 9/99

2

Page 8
Image 8
American Power Conversion SUDP8000I, SUDP6000I, SUDP4000I, SUDP10000I user manual Initial Inspection, Unpacking