American Power Conversion SUDP6000I, SUDP8000I, SUDP4000I, SUDP10000I Batteries, Storage, Service

Models: SUDP4000I SUDP8000I SUDP6000I SUDP10000I

1 24
Download 24 pages 1.42 Kb
Page 21
Image 21

Batteries

Automatic Battery Check

The battery test is automatically carried out every third month, if the automatic battery test function is set. The battery test starts when the batteries are fully charged. There is no alarm given for the battery operation and the display shows normal operation.

Manual Battery Check

1.Let the Smart-UPS DP run in normal operation for 24 hours.

2.Use the PowerChute® power management software to start the self-test.

WARNING:

The tests are carried out to detect possible failure in the Smart-UPS DP. Save all work on the connected load before tests are

started. Battery tests should be run during noncritical periods for computer operation safety reasons.

Battery Replacement

The built-in batteries are designed for five years of service life. Service personnel will replace the batteries every three to five years, or when an annual check gives an unsatisfactory result. See your dealer or call the number in this manual for information on replacement battery.

Note:

Please read the cautions in the Safety Section at the beginning of this User’s Guide. Once the battery is

disconnected, the loads are not protected from power outages.

Batteries must be recycled. Deliver the battery to an appropriate recycling facility or ship it to the supplier in the new battery’s packing material. See the new battery instructions for more information.

Storage

Storage Conditions

Store the UPS covered and upright in a cool, dry location, with its battery fully charged. Before storing, charge the UPS for at least 2 hours. Remove any accessories in the accessory slot and disconnect any cables connected to the computer interface port to avoid unnecessarily draining the battery.

Extended storage

At -15 to +30 °C (+5 to +86 °F), charge the UPS’s battery every 6 months.

At +30 to +45 °C (+86 to +113 °F), charge the UPS’s battery every 3 months.

Service

If the UPS requires service do not return it to the dealer!

Follow these steps:

1.Use the Troubleshooting section of the Quick Reference Guide to eliminate common problems.

2.Verify that no circuit breakers are tripped. A tripped circuit breaker is the most common UPS problem!

3.If the problem persists, call customer service or visit the APC Internet Website (www.apcc.com).

4.Note the model number of the UPS, the serial number, and the date purchased. A technician will ask you to describe the problem and try to solve it over the phone, if possible. If this is not possible the technician will schedule a service call.

15

990-1007A, Revision 2 9/99

Page 21
Image 21
American Power Conversion SUDP6000I, SUDP8000I, SUDP4000I, SUDP10000I user manual Batteries, Storage, Service