| Installation |
TROPIC | Instructions |
7038.400 |
Bidet Faucet and Transfer Valve with
EverClean™ Finish & SpeedConnect™ Drain
Congratulations on purchasing your American Standard faucet with EverClean finish and Speed Connect drain, two features found only on American Standard faucets.
EverClean Finish
•One wipe effortlessly removes spots
•Eliminates the need for cleaners and scrubbing
•Permanent surface protectant remains beautiful for the life of the faucet
•EverClean™ available on: Polished Chrome, Satin Nickel,
Stainless Steel, Polished Brass (or any combination of these finishes)
Certified to comply with ANSI A112.18.1
M 9 6 8 8 9 3
*Your new American Standard faucet is designed to work only with the SpeedConnect drain.
To ensure that your installation proceeds
|
| FINISHED | 8 TO 12 |
| ||
Dimensions | TRANSFER VALVE |
|
| |||
WALL |
|
| ||||
(FOR FLUSHING |
|
| ||||
BIDET OUTLINE | RIM OR SPRAY) |
|
| |||
|
| (C) | (H) | |||
IS SYMBOLIC | 7/8 DIA. | |||||
DIA. | ||||||
|
|
|
|
| ||
DOUCHE ADJ. |
|
|
| |||
DIA. |
| |||||
SPRAY | TO | DIA. |
|
| ||
|
|
|
|
| ||
|
| MAX. |
|
| ||
|
|
| FOR GROUND JOINT | |||
DIA. |
|
|
| CONNECTION OR 1/2 " | ||
|
|
|
|
| O.D. SLIP (INLETS) | |
|
|
| FINISHED |
| REAR VIEW WITH | |
| FLOOR |
| WALL REMOVED | |||
|
|
|
|
|
Required tools
Screwdriver | Plumbers' Putty or |
| Caulking |
Phillips Screwdriver |
|
| Channel Locks |
Adjustable Wrench
Tubing Cutter
1 |
|
| Turn off hot and cold water |
| |
BIDET FAUCET INSTALLATION | CAUTION |
| |||
supplies before beginning. | 6 | ||||
|
| ||||
|
|
|
|
Place RUBBER RING (10) into DECK ADAPTER (4).
Install LOCKNUT (1) and RUBBER WASHER (2) onto VALVE BODIES (3, 3a). From under side of mounting surface, install VALVE BODY (3, 3a) through valve mounting holes. Threads of VALVE BODY (3, 3a) should extent at least 5/16 of a inch above mounting surface top. Fig. A. Thread DECK ADAPTER (4) onto VALVE BODIES (3, 3a) until snug against internal stop. If necessary, adjust LOCKNUT (1).
| 7 | |
4 | BIDET | |
10 | LEDGE | |
8 | ||
|
Tighten LOCKNUTS (1) with WRENCH (5) (supplied) to secure VALVE BODIES (3, 3a).
Remove ESCUTCHEON (6), WASHER (7) and UPPER GASKET (8) from TRANSFER VALVE (9). Insert TRANSFER VALVE (9) into the center forward hole of BIDET.
Fig. A.
5/16''
MIN.
4
10
MOUNTING SURFACE
2
|
| 3 | 3a |
2 |
|
| |
HOT |
| COLD | |
1 |
|
| 9 |
|
|
|
Replace UPPER GASKET (8) and WASHER (7) and ESCUTCHEON (6) until it locks against internal stop. Position the side threaded outlet rearward and secure MOUNTING NUT (11).
3, 3a
1
5
11
2 SPRAY INSTALLATION
Assemble SPRAY BODY (1) to BIDET. Using putty, seal underside | 6 |
of SPRAY BODY FLANGE (2) and secure with NUT (3). |
8 | 2 | 9 |
| PUTTY | 1 |
7
3
Thread SPRAY HOSE (4) with SEAL WASHER (5) to SPRAY BODY (1). Connect other end of HOSE (4) with SEAL WASHER (6) to side outlet NIPPLE (7) of the TRANSFER VALVE (8).
4
5
Thread SPRAY CAP (9) onto SPRAY BODY (1).
4
1