Expansion/Triple Chassis Installation
Step 2: Install If the UPS uses more than one APC management product, see
the Network Installation of Multiple Management Cards, a copy of which
Management came with the Management Card. You must install the APC
Cardmanagement products in the correct order for them to operate properly.
The Network Management Card is sensitive to static electricity. When handling the
Management Card, touch only the end plate
while using one or more of these electrostatic- Caution discharge devices (ESDs): wrist straps, heel
straps, toe straps, or conductive shoes.
1.If a cable is connected to the serial port at the UPS or chassis, stop the APC service that uses that serial connection and disconnect the cable.
2.If you are installing a chassis, connect the chassis to the UPS serial port.
3.Use the same screws that hold the expansion slot cover in place to secure the Management Card in the chassis slot.
4.Connect a network interface cable to the Management Card’s
5.If you are using the AC Adapter (AP9505):
a.Connect the adapter to the chassis.
b.Connect the adapter to an independent AC input so that the Management Card can continue to operate if the UPS is turned off or fails.
6.If you disconnected a cable in step 1, reconnect that cable to the serial port at the chassis, and restart the associated APC service.
7.See “Quick Configuration” on page 10.
Probe Modem
8
Installation and | 9 |