![](/images/new-backgrounds/1298878/29887821x1.webp)
Rack-mount installation
1.Choose a location for the Rack Monitor 200 in the front or rear of the rack. The Rack Monitor 200 occupies one
Caution: To avoid equipment damage, use only the hardware provided when installing the brackets.
2. Install the brackets ( and ), including the power cord retainer bracket, on the end nearest the AC Line Inlet.
Bracket
Power cord retainer bracket
AC Line Inlet
3. Secure the Rack Monitor 200 to the rack, using cage nuts and screws (provided with the rack).
4. See “Power cord and network cable connections” on page 8.
NetBotz Rack Monitor 200 Installation and Quick Configuration Manual | 7 |