How to Install the Rack Monitor 200

Note: Install the Rack Monitor 200 in an environment compatible with the environmental specifications on page 23.

Note: When you install the Rack Monitor 200 in the rack, do not create a hazardous condition due to uneven mechanical loading. For example, do not use the Rack Monitor 200 as a shelf.

You can install the Rack Monitor 200 in the front or the rear of the rack using the rack-mount option, which requires 1 U of rack space. If using an APC NetShelter® VX or SX rack, you also have the option to use the toolless peg-mounts, which do not use any U-spaces.

Toolless peg-mount installation

Note: The toolless peg-mount installation is only available with a NetShelter VX or SX rack or enclosure.

Caution: To avoid equipment damage, use only the hardware provided when installing the power cord retainer bracket.

1. Install the power cord retainer bracket as shown.

8-32 x 1/4-in Phillips-head screws

 

 

Power cord retainer bracket

 

 

2. In the left or right cable channel in the rear panel of the enclosure, install the Rack Monitor 200 in a set of mounting holes. Be sure to push down until it locks.

3. See “Power cord and network cable connections” on page 8.

6

NetBotz Rack Monitor 200 Installation and Quick Configuration Manual

Page 10
Image 10
APC NBRK0200 configurationmanual How to Install the Rack Monitor, Toolless peg-mount installation