INSTALLATION INSTRUCTIONS
ELECTRICAL INSTALLATION (continued):
BREAKER PANEL
15AMP 2 POLE GFCI BREAKER
15AMP 1 POLE
GFCI BREAKER
HEATER | MAIN |
RED |
|
WHITE |
|
BLACK |
|
GROUND |
|
WHITE |
|
BLACK |
|
GROUND |
|
BLOWER |
PLEASE SEE DIAGRAMS 4A AND 4B. (PAGE 14)
BONDING WIRE: Connect a #8 bare copper bonding wire from the pump motor to the heater and then to the cold water plumbing or other suitable ground. Grounding is required.
For
AQUATIC INDUSTRIES, INC. | 13 |