7.Remove fuel line from engine first. Drain fuel from line back into fuel tank.

8.Remove the electric clutch and the anti-rotation bolt.

9.Remove the engine bolts.

10.Lift engine out of the unit and off the frame with a hoist (engine).

11.Service, overhaul, or replace engine as required.

12.If replacing engine with a new engine, the following items will have to be removed (if used) from the old engine. These items will not be included with a new engine:

Engine sheave and key

Mounting hardware

Engine wiring harness.

5.10 ENGINE INSTALLATION

1.Check the engine base and unit frame for damage before installing the engine.

2.Place the throttle and choke controls, fuel line, and electrical wires out of the way prior to installing the engine.

3.Once the engine is bolted onto the frame, install the exhaust system and then tighten the mounting hardware.

4.Install the engine sheave, belts, springs, electrical wiring, throttle, and choke controls.

5.Install the negative battery cable onto the battery.

6.Install the fuel line.

7.Fill engine with 10-30 above 32°F (0°C) or 5W30 below 32°F (0°C).

8.Install the engine cover, then test operation and function of the engine.

WARNING: AVOID EXHAUST FUMES! DO NOT run engine in an enclosed area. ALWAYS provide good ventilation and wait until hazard has been removed.

9.Check the fluid levels as follows:

a)Start the engine and allow it to reach to operating temperature. DO NOT operate engine for more than two minutes.

b)Shut the engine off, wait for engine to cool, and be sure the engine oil level is between the full and add marks on the dipstick. If it is below the add mark, add recommended oil. DO NOT overfill.

5 - 17