Common Systems Connection Standards

AT&T Services, Inc

Date: August 31, 2007

ATT-TP-76450, Issue 9

6.11Central Office Copper Wire and Cable

6.12Central Office Copper Coaxial Cable

6.13Central Office Copper "Bits" Synchronous Timing Cables

6.14Central Office Copper Wire and Cable Minimum Inside Bend Radius

6.15Central Office Copper Coaxial Cable Minimum Inside Bend Radius

6.16Copper Cable Terminations

6.17Cable Trays

6.18Tie Bar

6.19Use of "Y" Cable

6.20Unusual Cable Types

6.21Protection of Cable and Jumpers

7 VENDOR DOCUMENTATION

7.1Softcopy Documentation

7.2Hardcopy Documentation on Request

7.3Craft Interface Instructions

7.4Installation Guide: installation, provisioning, and testing of the network element

7.5Installation Guide: Creation, provisioning, and testing of a multi-node ring or system

7.6Alarm/Trouble Shooting Guide

7.7Personnel Injury and Equipment Damage Warnings

7.8Reference Guide

7.9Consistent terminology throughout Documentation

7.10Consistent terminology between Documentation & Platform

7.11Revisions Numbering

7.12Revision History

7.13.Documentation Submitted for Review

7.13.1Excerpts from Documentation

7.13.2List of Documentation

8 OTHER INTERCONNECTION REQUIREMENTS

8.1Equipment Lighting

8.2Test (Streaker) Card Standards

“Part” & “N/A” Footnotes:

Rqmt#

Comment

 

 

 

 

 

 

Copyright ©2004 – 2006, AT&T Knowledge Ventures

All rights reserved

Page 29

Page 29
Image 29
AT&T 76450 manual Vendor Documentation, Part & N/A Footnotes Rqmt# Comment