Avanti BD6000 Installation Of t he Keg Coupler, Installation of the CO2 Air Line Hose

Models: BD6000

1 36
Download 36 pages 16.19 Kb
Page 13
Image 13
Installation Of t he Keg Coupler

Installation Of t he Keg Coupler

?Insert the keg coupler provided into the locking neck of the beer keg and turn it clockwise to lock into position, making sure the keg coupler is in the closed position. (See Figure 3)

Figure 3

Installation of the CO2 Air Line Hose

?Attach the end o f the red hose to the hose connection on the keg coupler. Secure hose by using the connector and make sure there are no leaks.

Installation of Protective Metal Plate

?This plate should always be installed when the keg is in place to protect against unnecessary damage to the floor of the cabinet liner.

Installation of the Beer Keg

?Position the beer keg directly in front of the open door. Using keg handles only, carefully lift the beer keg. (See Figure 4 )

?To place the beer keg inside the cabinet, brace your knees behind the beer keg. Lift the front of the keg just enough so the front edge of the keg is resting on the front edge of the Beer Dispenser bottom cabinet. (See Figure 5)

?Grasp the keg handles and slide it all the way into the cabinet.

Figure 4

Figure 5

Installation of CO2 Air Line Hose through the Cabinet Wall

?Remove plug located at the exterior back (top left hand corner).

?Save it for later use if you decide to convert unit to an all refrigerator.

?Insert the open end of the air line (red) from the cabinet through the uncovered hole.

(See Figure 6)

Figure 6

13

Page 13
Image 13
Avanti BD6000 Installation Of t he Keg Coupler, Installation of the CO2 Air Line Hose, Installation of the Beer Keg