Installation

Chapter 4

Installation

The P334T-ML is ready to work after you complete the installation instructions below.

Required Tools

Make sure you have the following tool at hand before undertaking the Installation procedures:

Phillips (cross-blade) screwdriver

Site Preparation

You can mount Avaya P330 switches alone or in a stack in a standard 19-inch equipment rack in a wiring closet or equipment room. Up to 10 units can be stacked in this way. When deciding where to position the unit, ensure that:

It is accessible and cables can be connected easily and according to the configuration rule.

Cabling is away from sources of electrical noise such as radio transmitters, broadcast amplifiers, power lines, and fluorescent lighting fixtures.

Water or moisture cannot enter the case of the unit.

There is a free flow of air around the unit and that the vents in the sides of the case are not blocked.

Use Octaplane cables to interconnect with other switches.

The environmental conditions match the requirements listed below:

Table 4.1 Environmental Prerequisites

Operating Temp.

-5 to 50°C (23 to 122°F)

Relative Humidity

5% to 95% non-condensing

Avaya P334T-ML User’s Guide

17

Page 33
Image 33
Avaya P3343T-ML manual Installation, Required Tools, Site Preparation, Chapter