Bakers Pride Oven FH-28 Installation, Unpacking and Handling, Inspection for Shipping Damage

Models: FH-28

1 24
Download 24 pages 13 b
Page 11
Image 11
Installation

Ventless Hood System

Installation

 

 

Installation

Unpacking and Handling

Inspection for Shipping Damage

YOU are responsible for filing all freight claims with the delivering truck line. Inspect all cartons and crates for damage as soon as they arrive. If damage to cartons or pallets is found, or if a shortage is found, note this on the bill of lading (all copies) prior to signing and receiving.

If damage is found when the equipment is opened, immediately call the delivering truck line and follow up the call with a written report indicating concealed damage to your shipment. Ask for an immediate inspection of your concealed damage item. Packaging material MUST be retained to show the inspector from the shipping line.

Location and Clearance

Place the Filter Hood in a location with clearance as shown in the figure and data below. These distances provide for proper clearance to combustible surfaces, access for maintenance, and proper air flow from hood exit vent.

MINIMUM CLEARANCE HOOD TO COMBUSTIBLE

18 in. (FH-28) SIDES, 0 in. BACK, 0 in. TOP, 0 in. BOTTOM NON-COMBUSTABLE REAR WALL REQUIRED FOR FH-28 WALL MOUNT

APPLIANCE CLEARANCE

Vat to sides of hood: 6.25 in. (FH-28)

Griddle to sides of hood: 0 in., Sandwich grills to sides of hood: 6 in.

Cooking surface must be at least 3.5 inches behind the front edge of the hood. Appliance cabinet top or cooking surface to be level with bottom of hood sides ± 3 in.

9

Page 11
Image 11
Bakers Pride Oven FH-28 Installation, Unpacking and Handling, Inspection for Shipping Damage, Location and Clearance