Bakers Pride Oven FH-28 Scheduled Maintenance, Frequency, Performed By, Part, Activity, Daily

Models: FH-28

1 24
Download 24 pages 13 b
Page 22
Image 22
Maintenance

Ventless Hood System

Maintenance

 

 

Maintenance

Electrocution could occur if this unit is hosed down with water. This unit is NOT designed for hose wash-down cleaning! Refer to scheduled maintenance below for proper hood cleaning.

Electrocution could occur if power is not removed from this unit before servicing. Remove power at disconnect or circuit breaker BEFORE servicing hood.

Scheduled Maintenance

Use the following table to help manage scheduled maintenance activities.

FREQUENCY

PERFORMED BY
PART
ACTIVITY

 

 

 

 

Daily

User

Entire Hood

Wipe unit down with a soft rag and mild

 

 

 

cleaning agent.

 

 

 

 

 

User

Condensation

Check condensation trough. Empty if

 

 

trough

necessary.

 

 

 

 

 

User

Grease Baffle

Clean grease baffle. If necessary, refer

 

 

 

to the procedure in this manual for

 

 

 

cleaning the baffle.

 

 

 

 

Weekly

User

Particle/Odor Filter

Inspect particle/odor filter. In low to

 

 

 

medium volume applications, the filter

 

 

 

may need replacement prior to the

 

 

 

indicating light turning on. This

 

 

 

condition will be evident by a strong

 

 

 

odor coming from the face of the filter.

 

 

 

If necessary, refer to the procedure in

 

 

 

this manual for replacing the filter.

 

 

 

 

Monthly

User

Door and Filter

Check door and filter interlock

 

 

Interlock

operation. The unit should not operate

 

 

 

with the front door open or either the

 

 

 

grease baffle or particle/odor filter

 

 

 

removed. Clean area between grease

 

 

 

baffle and particle/odor filter.

 

 

 

 

Injury from rotating fan blades could occur if power is not removed from this unit before cleaning the blower section. Remove power at disconnect or circuit breaker BEFORE cleaning the blower section.

3 Months

User

Blower Section

Clean the blower section.

 

 

 

 

6 Months

Authorized Service

Fire Extinguishing

Have the fire extinguishing system

 

agent

System

inspected.

 

 

 

 

20

Page 22
Image 22
Bakers Pride Oven FH-28 Scheduled Maintenance, Frequency, Performed By, Part, Activity, Daily, Weekly, Monthly, Months