Bakers Pride Oven FH-28 operation manual Leveling, Ventless Hood System, Installation

Models: FH-28

1 24
Download 24 pages 13 b
Page 12
Image 12
Leveling

Ventless Hood System

Installation

 

 

Leveling

1.Adjust the four feet provided on the bottom of the unit so there is a minimum of 6” clearance below the frame side members (NSF/UL REQUIREMENTS).

2.Check for level from side to side and front to back using a 4’ level placed appropriately on the frame.

10

Page 12
Image 12
Bakers Pride Oven FH-28 operation manual Leveling, Ventless Hood System, Installation