2. Installation Guidelines
2.8 Rigging points and accessories
2.8.1 Overview
Clamps
Slotsare made in the carry handle frame for easy inserting the overlockers and for easy adjusting the clamps position so that this
position matches with the rigging points.
Consulta professional structura l engineer prior to suspending the ceiling mount from a structure not intended for that use. Always
ensure the working load limit of the structure supporting the projector.
WARNING:Whenmounting the projector to th e ceiling or to a rigging system, always mount security chains.
Complete documentation
For a complete documentation consultmanu alR597674 6.
2.8.2 Mounting the clamps
Necessary tools
Wrench 17 mm
Steps to be taken
1. Insert the mushroom headsqu are neck bolt into the mounting hole (1). (image 2-11)
2. Slide the bolt into the groove until the exact position is reached (2).
3. Slide a washer on the bolt (3).
4. Secure with a first nut (4).
5. Turn a second nut on the bolt (5).
6. Turn the movable connecting-piece almost fully onto the bolt. Stopsw itha small distance betwee nthe c lampasse mblya ndth e
second nut so that the movable connecting-piece is still turnable (5).
7. Turnnow the connecting-piece into the direction of the lens and secure this position by turning up the second nut. (image2-12)
8. Turn the clamp on the movable connecting-piece.
R5976815 RLM G5I PERFORMER 02/06/2006 15