Baxi Potterton Gold FSB 30 HE manual Site Requirement, Sink, ± 10 from vertical, Min mm

Models: Gold FSB 30 HE

1 60
Download 60 pages 23.16 Kb
Page 18
Image 18

7.0 Site Requirement

Termination via internal discharge branch e.g sink waste - downstream

Direct Connect Fitting

Pipe must terminate

 

 

 

 

 

 

 

 

 

 

above water level but

 

 

 

 

 

 

 

 

 

 

below surrounding surface

 

Sink

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10° 10°

Branch of Tee to be

± 10° from vertical

7.7

Condensate Disposal (cont.)

9. Ensure that the condensate can discharge freely (without

blockage or restriction of the pipe) into the drain.

10. Examples are shown of condensate pipe methods of

termination:-

 

 

i)

via an internal discharge branch

 

 

(e.g. sink waste) - Fig. C.

 

ii)

to an internal or external soil and vent pipe -

Fig. C

From Boiler

 

Fig. D.

iii)

to a drain or gully - Fig. E. Ensure that the

 

condensate can discharge freely (without

 

blockage or restriction of the pipe) into the

 

drain.

iv)

to a soakaway - Fig. F.

 

 

Termination to an internal soil and vent pipe

Direct Connect Fitting

From Boiler

Min. 450mm

Fig. D

Termination to a drain or gully

From Boiler

Fig. E

Pipe must terminate above water level but below surrounding surface

Termination to a purpose made soak-away

 

 

 

 

 

 

 

 

 

 

500mm Min

 

 

 

 

 

 

 

 

 

 

From Boiler

 

 

 

 

 

 

 

 

 

Holes in the soak-away must

 

 

 

 

 

 

 

 

 

 

face away from the building

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. F

18© Baxi Heating UK Ltd 2011

Page 18
Image 18
Baxi Potterton Gold FSB 30 HE manual Site Requirement, Sink, ± 10 from vertical, Min mm