Heat Exchanger
Automatic Air Vent
Fig. 62
Screw
Pump
Automatic Air
Vent
Fig. 63 | Pump | 2 |
|
|
|
|
|
1 | 3 |
|
|
|
| ||
|
|
|
|
|
| ||
|
| 0 | 4 |
|
|
|
|
|
| bar |
|
|
|
|
|
Selector Switch |
|
|
|
|
|
| |
| Display | Fig. 64 | Pressure Gauge | ||||
|
|
|
|
|
|
| |
|
|
| 2 |
| 1 | 12 |
|
|
|
| 3 |
|
| 11 |
|
|
|
| 4 |
|
|
| 10 |
Reset |
| 2 | 5 |
|
|
| 9 |
|
| PM |
|
|
|
| |
|
| 3 |
|
|
| 8 | |
|
| 7 |
|
|
| 7 | |
|
|
| 8 |
|
|
| AM |
|
| 0 4 | 9 |
|
| 0 | 5 |
|
| bar | 10 |
|
|
| 4 |
|
|
| 11 |
|
| 3 |
|
|
|
| 12 | 1 |
| 2 |
|
| Central Heating | Domestic Hot Water |
|
|
|
| |
| Temperature Control | Temperature Control |
|
|
|
|
Fig. 65
11.0Commissioning
11.1Commissioning the Boiler
1.Reference should be made to BS 5449 Section 5 when commissioning the boiler.
2.Open the mains water supply to the boiler.
IMPORTANT: The heat exchanger air vent on top of the boiler (Fig. 62) MUST be opened before filling the primary system.
3.Open all hot water taps to purge the DHW system.
4.Ensure that the filling loop is connected and open, then open the heating flow and return valves on the boiler.
5.Open the screw on the automatic air vent on the pump body (Fig. 63).
6.The system must be flushed in accordance with BS 7593 (see Section 6.2) and the flushing agent manufacturers instructions.
7.Pressurise the system to 1.5 bar (Fig. 64) then close and disconnect the filling loop.
8.Turn the gas supply on and purge according to in GB BS 6891 and in IE I.S. 813 “Domestic Gas Installations”.
9.Test for gas soundness.
10.Hinge the facia panel upwards and refit the case front panel. Tighten the securing screws.
11.Turning either of the temperature control knobs will set the relevant temperature. When the knob is turned the display will alter and show the selected temperature. After a few seconds the display reverts to show the current boiler temperature (Fig. 65).
34© Baxi Heating UK Ltd 2008