Baxi Potterton Gold HE A Range manual GAS Boiler Commissioning Checklist

Models: Gold HE A Range

1 60
Download 60 pages 35.85 Kb
Page 58
Image 58

COLLECTIVE MARK

BENCHMARK No.

5

1

1

6

2

8

2

1.0 Introduction

 

 

 

 

 

 

 

GAS BOILER COMMISSIONING CHECKLIST

BOILER SERIAL No.

 

 

 

NOTIFICATION No.

 

 

 

 

 

CONTROLS To comply with the Building Regulations, each section must have a tick in one or other of the boxes

 

 

 

 

 

 

 

 

 

 

TIME & TEMPERATURE CONTROL TO HEATING

 

ROOM T/STAT & PROGRAMMER/TIMER

 

 

PROGRAMMABLE ROOMSTAT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TIME & TEMPERATURE CONTROL TO HOT WATER

 

CYLINDER T/STAT & PROGRAMMER/TIMER

 

 

COMBI BOILER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEATING ZONE VALVES

 

 

FITTED

 

 

NOT REQUIRED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HOT WATER ZONE VALVES

 

 

FITTED

 

 

NOT REQUIRED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THERMOSTATIC RADIATOR VALVES

 

 

FITTED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AUTOMATIC BYPASS TO SYSTEM

 

 

FITTED

 

 

NOT REQUIRED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FOR ALL BOILERS CONFIRM THE FOLLOWING

THE SYSTEM HAS BEEN FLUSHED IN ACCORDANCE WITH THE BOILER MANUFACTURER’S INSTRUCTIONS?

THE SYSTEM CLEANER USED

THE INHIBITOR USED

FOR THE CENTRAL HEATING MODE, MEASURE & RECORD

GAS RATE

 

 

m3/hr

BURNER OPERATING PRESSURE (IF APPLICABLE)

 

N/A

 

 

CENTRAL HEATING FLOW TEMPERATURE

 

 

CENTRAL HEATING RETURN TEMPERATURE

 

 

ft3/hr

mbar

°C

°C

FOR COMBINATION BOILERS ONLY

HAS A WATER SCALE REDUCER BEEN FITTED?

YES

 

NO

 

 

 

 

WHAT TYPE OF SCALE REDUCER HAS BEEN FITTED?

FOR THE DOMESTIC HOT WATER MODE, MEASURE & RECORD

GAS RATE

 

 

m3/hr

MAXIMUM BURNER OPERATING PRESSURE (IF APPLICABLE)

 

 

N/A

 

 

 

 

COLD WATER INLET TEMPERATURE

HOT WATER OUTLET TEMPERATURE

WATER FLOW RATE

ft3/hr

mbar

°C

°C

lts/min

FOR CONDENSING BOILERS ONLY CONFIRM THE FOLLOWING

THE CONDENSATE DRAIN HAS BEEN INSTALLED IN ACCORDANCE WITH

 

THE MANUFACTURER’S INSTRUCTIONS?

YES

FOR ALL INSTALLATIONS CONFIRM THE FOLLOWING

THE HEATING AND HOT WATER SYSTEM COMPLIES

WITH CURRENT BUILDING REGULATIONS

THE APPLIANCE AND ASSOCIATED EQUIPMENT HAS BEEN INSTALLED AND COMMISSIONED

IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS

IF REQUIRED BY THE MANUFACTURER, HAVE YOU RECORDED A CO/CO2 RATIO READING? N/A

 

YES

 

CO/CO2 RATIO

 

 

 

 

 

 

 

 

 

THE OPERATION OF THE APPLIANCE AND SYSTEM

 

 

 

 

 

 

CONTROLS HAVE BEEN DEMONSTRATED TO THE CUSTOMER

 

 

 

 

 

 

 

 

 

 

 

 

 

THE MANUFACTURER’S LITERATURE HAS BEEN LEFT WITH THE CUSTOMER

 

 

 

 

 

 

 

 

 

 

 

 

COMMISSIONING ENG’S NAME PRINT

 

 

 

CORGI ID No.

 

1 © Baxi Heating UK Ltd 2008

SIGN

 

 

 

DATE

 

 

1

 

 

 

 

58

Page 58
Image 58
Baxi Potterton Gold HE A Range manual GAS Boiler Commissioning Checklist