23
1
22
14
21
10
9 8
7
|
| 2.0 | General Layout | |
|
|
|
|
|
|
|
| Layout | |
| 2.1 | |||
| 1. | Expansion Vessel | ||
15 | 2. | Automatic Air Vent | ||
| ||||
| 3. | DHW Plate Heat Exchanger | ||
| 4. | Circulation Pump | ||
| 5. | Drain Off Point | ||
| 6. | Pressure Relief Valve | ||
| 7. | Optional Integral Timer Position | ||
13 | 8. | Central Heating System Pressure Gauge | ||
| 9. | PCB | ||
16 | 10. | Control Box | ||
| 11. | |||
20 | 12. | Condensate Trap | ||
| ||||
| 13. | Flame Sensing Electrode | ||
| 14. | Spark Electrode | ||
| 15. | Primary Heat Exchanger | ||
| 16. | Fan Assembly | ||
| 17. | On/Off/Reset Selector Switch | ||
| 18. | Central Heating Temperature Control | ||
| 19. | Hot Water Temperature Control | ||
| 20. | Venturi | ||
| 21. | Air/Gas Collector | ||
| 22. | Combustion Box Cover & Burner | ||
| 23. | Igniter | ||
| 24. | Burner On Light | ||
| 25. | Central Heating Mode Light | ||
| 26. | Domestic Hot Water Mode Light | ||
12 | 27. | Display | ||
|
|
|
| |
| 28. | Integral Timer |
11 | 2 |
|
3
4 | 5 |
6
25 26
Reset |
|
|
|
| 2 |
|
|
|
|
| |
|
|
|
|
| 3 |
|
|
|
| 0 | 4 |
|
|
|
|
| bar |
17 | 27 | 24 | 18 | 19 | 8 |
8© Baxi Heating UK Ltd 2008
2 | 1 | 12 |
|
3 |
| 11 |
|
4 |
|
| 10 |
5 |
|
| 9 |
PM |
|
| 8 |
7 |
|
| 7 |
|
|
| |
8 |
|
| AM |
9 |
| 0 | 5 |
10 |
|
| 4 |
11 |
| 3 |
|
12 | 1 | 2 |
|
28