Dual Manual Fold “U” Handrail (with Shield) Instructions

Folding “U” handrails (with safety shield) are manually operated. The handrails rest on the platform when the lift is not in use. The handrails must be folded down to the platform (horizontal position) before stowing the lift.

Note: The bridge plate (inboard roll stop) must be folded down to the platform (horizontal posi- tion) before the handrails are folded down.

The handrails are lifted to the

vertical position and locked in position with a latch that auto- matically engages the platform bracket when fully raised. Lifting the round knob located on the vertical handrail tube disengages the latch.

To Deploy Handrails:

1.Lift front (right)

handrail to

 

vertical

 

latched

 

position. Be

UVL

certain latch

 

is engaged.

 

To Stow Handrails:

2.Lift rear (left) handrail to

vertical

 

latched

UVL

position. Be

certain latch

 

is engaged.

 

Before stowing lift:

Inboard

 

Roll Stop

1. Fold down

UVL

 

inboard roll

 

stop (bridge

 

plate).

 

2. Lift round

latching knob to

 

disengage latch

UVL

and fold rear

 

(left) handrail

 

down to plat-

 

form (horizontal

 

position).

 

Latch

Knob

Latch

Knob

3. Lift round latching knob to disengage latch and fold front (right) handrail down to plat- form (horizontal position).

WARNING

Fold handrails down before stowing lift. Failure to do so may result in serious

bodily injury and/or property damage.

UVL

Page 14

Page 16
Image 16
Braun 604XA, 604XD, 604XC, 855R Dual Manual Fold U Handrail with Shield Instructions, To Deploy Handrails, To Stow Handrails