START-UP CHECKLIST

(REMOVE AND STORE IN JOB FILE)

I. PRELIMINARY INFORMATION

MODEL NO.: _____________________________ SERIAL NO.: ________________________________________

DATE: __________________________________ TECHNICIAN: ________________________________________

II. PRE-START-UP (Insert checkmark in box as each item is completed)

( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

( ) VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS

( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS

( ) CHECK GAS PIPING FOR LEAKS

( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE

( ) VERIFY THAT UNIT INSTALLATION IS LEVEL

( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS

III.START-UP ELECTRICAL

SUPPLY VOLTAGE L1-L2__________ L2-L3__________ L3-L1__________

COMPRESSOR AMPS L1 __________ L2 __________ L3 __________

INDOOR (EVAPORATOR) FAN AMPS __________

TEMPERATURES

OUTDOOR (CONDENSER) AIR TEMPERATURE __________ DB

RETURN-AIR TEMPERATURE __________ DB __________ WB

COOLING SUPPLY AIR __________ DB __________ WB

GAS HEAT SUPPLY AIR __________

PRESSURES

GAS INLET PRESSURE __________ IN. WG

GAS MANIFOLD PRESSURE __________ IN. WG

REFRIGERANT SUCTION __________ PSIG SUCTION LINE TEMP* __________

REFRIGERANT DISCHARGE __________ PSIG DISCHARGE TEMP† __________

( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS

( ) VERIFY THAT THREE-PHASE SCROLL COMPRESSOR IS ROTATING IN CORRECT DIRECTION.

*Measured at suction inlet to compressor.

† Measured at liquid line leaving condenser.