Step 8—Mount the Cabinet
!WARNING
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal injury or death.
Before installing or servicing system, always turn off main power to system. There may be more than 1 disconnect switch.
GAPA |
|
|
| |
! | CAUTION | |||
|
|
UNIT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage.
Cabinets will support a maximum weight of 400 lbs when installed beneath a vertical furnace or
a.Turn off power to the heating and cooling system.
b.Remove the existing furnace filter and discard. Excessive system static may result if the Perfect Airt Purifier is used with other filtration devices.
c.Remove the air purifier cartridge and enhancement module from the Perfect Airt Purifier cabinet.
d.Position the cabinet between the furnace and return air duct (see Fig. 4). A transition duct may be required.
e.Furnace adapters have been included for installer convenience. They are designed for top or bottom mount installations (see Fig. 5).
f.Return air duct adapters have been included for installer convenience. They should be used to connect the upstream side of the air purifier cabinet to the return air duct (see Fig. 6).
g.Install foam tape between the furnace and the air purifier cabinet.
h.Mounting holes are provided for ductwork and furnace attachment.
!CAUTION
UNIT DAMAGE HAZARD
Failure to follow this caution may result in unit damage.
Mounting holes are provided for duct work and furnace attachment. The screws on the
i.Seal seams with tape or caulking after the Perfect Airt Purifier cabinet has been secured.
Return Duct
Adapters (x4)
Return | Duct |
|
Furnace
Adapters (x2)
Furnace
Adapters (x2)
Return Duct
Adapters (x4)
Return | Duct |
|
Top Mount | Bottom Mount | Side Mount |
A06029
Fig. 4 - Mounting Perfect Airt Purifier Cabinet
4