SERVICE (cont.)
TANK HEATER (Cont.)
10. | Install new tank heater with gaskets on the tank lid |
| and secure with two hex nuts. |
11. | Install tank lid with limit thermostat, sprayhead |
| tube, tank heater, coil assembly (brewers with |
| faucet) and control thermostat with bracket (early |
| brewers only) using eight |
12. | Reconnect the inlet and outlet water lines to the |
| faucet coil assembly. |
13. | Secure spayhead tube to hood using a hex nut. |
14. | Install sprayhead. |
15. | Reconnect the wires to the limit thermostat, tank |
| heater and control thermostat. See limit thermo- |
| stat and control thermostat sections in this manual |
| when reconnecting wires. |
16. | Install fill basin, secure with tank inlet fitting and |
| gasket. Insert water supply line through grommet |
WHI to Terminal Block (White Insert on 120V or 100V Two Wire Models)
RED to Terminal Block (Red Insert on 120/ 240V Three Wire Mod- els or 200V and 240V Two Wire Models)
BLK to Control Thermostat (Brewers W/Out Faucet) BLK to Fuse (Brewers W/ Faucet)
in fill basin. |
17. Refer to Fig. 13 when reconnecting the tank heater |
wires. |
P1134.65
FIG. 13 TANK HEATER TERMINALS
Page 22 | 10690 062300 |
|