Bunn U3A service manual SERVICE cont SOLENOID

Models: U3A U3

1 42
Download 42 pages 23.98 Kb
Page 28
Image 28
SERVICE (cont.)

SERVICE (cont.)

SOLENOID

6.Remove the tank inlet tube grommet and dis- card.

7.Install new tank inlet tube grommet.

8.Install new solenoid assembly.

9.Install liquid level board, shield and secure solenoid assembly and shield to the component bracket with a #10-32 screw and flat washer..

10.Install water inlet tube to connector on the sole- noid.

11.Turn on the water supply to the brewer.

12.Refer to Fig. 23 and reconnect the wires.

BLU from Liquid Level

WHI

from Main

Harness

Board #1

(120/208V, 120/240V, 380V

 

and 440V Models)

 

RED

from Main

Harness

 

(208V and 240V Models)

EARLY MODELS

BLU from Liquid

Level Board #1

BLK from Main Har- ness

EARLY 230V - CE MODELS

LATE MODELS

BLU from Liquid Level

 

 

 

WHI

from Main

Harness

 

 

 

Board #1

 

 

 

(120/208V, 120/240V, 380V

 

 

 

 

and 440V Models)

 

 

 

 

RED

from Main

Harness

 

 

 

 

(208V and 240V Models)

 

 

FIG. 23 SOLENOID TERMINALS

P1741

 

 

Page 28

10060

081106

 

Page 28
Image 28
Bunn U3A service manual SERVICE cont SOLENOID